Learn more about current Liverpool Hospital redevelopment construction activity impacting hospital visitors. Please note that dates are subject to change due to weather and/or operational impacts.

From week beginning 17 August

On-site groundworks adjacent to the Brain Injury Unit will result in noise between 7am and 5pm Monday to Friday for approximately one week. A site compound has been established and traffic control will be in place to support safe pedestrian and vehicle travel during these works.

Until late August

As early works continue on streets surrounding Liverpool Hospital, the section of Goulburn Street between Elizabeth and Campbell Streets will be impacted by stormwater upgrade works which will affect pedestrian and vehicle access. Traffic control and signage will be in place to assist vehicles and pedestrians as needed.

Until late August

Works within the roadway and footpath of Elizabeth Street, between the Emergency Department and loading dock, will impact pedestrian and vehicle travel. Traffic control will be in place. Access to the hospital will be maintained at all times.

Until late August

To help prepare the site for construction, a range of road works and service upgrades continue along streets surrounding the hospital. Impacts include street parking restrictions, pedestrian route changes due to footpath works, temporary lane closures and night works. Learn more about these important early works.

Ongoing

Works within the P1 car park will require closure of the P1 entry ramp off
Elizabeth Street between 8pm and 6am, seven days a week. Diversions will be in place to direct vehicles to the P2 car park via Campbell Street and Burnside Drive. P3 car park access via Burnside Drive is also available.

Ongoing

The installation of temporary fencing and hoarding around construction zones in the hospital's P1 and P3 car parks will result in a reduction of available car parking spaces. Visitors using these areas may also experience dust, noise and vibration as a result of service relocation works, construction materials handling and related ongoing works. Learn more about the scope of these works.

Ongoing

Construction within the basement level of the new and old clinical services buildings will see regular drilling works conducted between the hours of 6am to 10am, Monday to Saturday, resulting in high-level noise and vibration. Additional drilling activity will take place between 6pm and 10pm until 26 August.